Ramesh and Ganesh can together complete a work in 16 days. After seven days of working together, Ramesh got sick and his efficiency fell by 30%. As a result, they completed the work in 17 days instead of 16 days. If Ganesh had worked alone after Ramesh got sick, in how many days would he have completed the remaining work?
Started 3 months ago by Shashank in
Explanatory Answer
Given that Ramesh and Ganesh can together complete a work in 16 days
After seven days of working together, Ramesh got sick and his efficiency fell by 30%.
To the original schedule of 16 days there are 9 more days and in this 9 days Ramesh fall short by 9
× 0.3x = 2.7x where x is the work done by Ramesh in a day
So the change = 2.7x (i.e. the gap because of drop in efficiency)
This 2.7x is compensated by one day of Ganesh + another 0.7 of Ramesh
2.7x = G + 0.7 x (Because the last day also he works with reduced efficiency)
2x = G
Hence Ganesh works twice as that of Ramesh.
If Ganesh had worked alone after Ramesh got sick means in the 7 days Ramesh would have
completed 7/48 of the task
Ganesh on each day can do 1/24 of the task
Task to be completed by Ganesh is 41/48 completely
One day he can complete 1/24 so 41/48 × 24/1 = 20.5 days
If Ganesh had worked alone after Ramesh got sick, the no.of days needed for completing the
remaining work is 20.5 – 7 = 13.5 days
-